nax Ultima Supreme is a Ultra Clear which has excellent Flow Levelling and Mirror like Gloss. Gives Performance at par with Premium 2K Products in the market.
know morenax Ultima Supreme is a Ultra Clear which has excellent Flow Levelling and Mirror like Gloss.
know morenax Ultima Premixed Colors are developed for best n class finish and excellent
know morenax Silicon Off is a blend of special solvents with excellent degreasing and cleaning properties
know morenax PRO Bodyfiller is an easy to sand and high productive bodyfiller used to fill
know morenax Premila 505 Blending Thinner is a proprietary solvent blend used for merging of painted
know morenax Ultima Slow Thinner is 2K Thinner for applications more than 30°C.
know moreEtch Primer | Nax Ultima Etch primer |
Mixing | Base : Activator 1 : 1 by volume. |
Maturation Time | 5 -10 minutes @ 25deg Centigrade |
Application( type & no.of coats) | Spray Gun at 40-50 PSI, Apply 1 coat using spray gun with 1.6 – 1.8 mm fluid nozzle |
DFT | 8 – 14 microns |
Air dry (at 30°C; 60 – 65% RH) | 45 – 60 minutes |
Apply Nax Ultima PUPS wet – on-wet without any sanding on Etch Primer cured as above |
Mixing | Base : Hardener 4:1: with 35-40% by volume of recommended Thinner |
For temperature < 30°C use PU Medium thinner: For temperature > 30°C & for large area application use PU Slow Thinner | |
Application( type & no.of coats) | Spray Gun at 40-45 PSI, Apply 2 coats using gun of 1.6 – 1.8 mm fluid nozzle |
DFT | 50 – 60 microns |
Drying schedule – Baking | at 60°C (effective metal temperature) for 30 minutes |
Air dry (at 30°C; 60 – 65% RH) | Dry Sandable in 90 -120 Min |
Sanding: Dry Sanding | P320 grade (for Solid Topcats) & P400 for Metallic Colors |
Cleaning | Clean with Nax Silicone Off using two – rag process, 1 for application and 1 for wipe-off |
Application | |
Recommended Mixing Ratio | 100 : 2 -3 gms of Activator |
Mix thoroughly and carefully | |
For filling (upto 3 mm), apply in several layers | |
Allowing each to dry between applications allowing each to dry between applications. | |
Play time | 3 Min |
Drying Time | 30°C & 60 – 65% RH |
Sandability time | 20 – 25 min |
Flatting | Dry sand with P80 – 120 followed by P150 – P220 |
Overcoatability time | After sandability time, Overcoat with Nax PUPS Grey for smooth and uniform surface for topcoat application |
Mixing | Base : Hardener 4:1: with 35-40% by volume of recommended Thinner |
For temperature < 30°C use PU thinner: For temperature > 30°C & for large area application use PU Slow Thinner | |
Application( type & no.of coats) | Spray Gun at 40-50 PSI, Apply 1 coat using spray gun with 1.6 – 1.8 mm fluid nozzle |
DFT | Whereever putty is applied 25 – 30 microns |
Drying schedule – Air dry (at 30°C; 60 – 65% RH) | Dry sandable in 60-90 Min |
Sanding: Dry Sanding | P320 grade (for Solid Topcats) & P400 for Metallic Colors |
Wet Sanding | P600 grade (for Solid Topcats) & P800 for Metallic Colors |
Cleaning | Nax Silicone Off using two – rag process, 1 for application and 1 for wipe-off |
Dry/ Wet sanding | 10 min |
Drying Time @ 30°C & 60 – 65% RH | |
Sandability time wet | P600 grade (for Solid Topcats) & P800 for Metallic Colors |
Overcoatability Time | After sandability time, Overcoat with Nax r for smooth and uniform surface for topcoat application |
DFT | 45-50 microns |
Mixing | Base : Hardener 4 : 1 by volume with 30-35% with Nax Premila 500 thinner for temperature < 30°C & with Nax Premila 501 Thinner for large area application and temperature > 30°C |
Maturation time | Not required |
Pot life at 30°C & 60 – 65% RH | 6 hours |
Application | 2 coats, ~ 5-10 minutes flash off between coats |
Drying schedule: baking | at 60°C (effective metal temperature) for 30 minutes |
OR | |
Graphics Application (grade) |
DFT | 15-20 microns |
Mixing | 1 : 1 with Superio Slow Thinner |
Maturation time | Not required |
Drying schedule: baking | Allow 15 – 20 minutes Flash-off @ 30°C & 60 – 65% RH before applying Clearcoat |
Apply Tack-rag between two coats of dry metallic colors and before applying clearcoat |
DFT | 40 – 50 microns |
Mixing | 3:1 with 25-30 % Superio Slow Thinner by volume |
Pot life @ 30°C & 60 – 65% RH | 6 hours |
Application | Apply 2 coats with 15 mins flash off between coats. Apply at a pressure of 45-50 PSI. using spray gun of fluid nozzle 1.3 – 1.5 mm fluid nozzle |
Drying schedule: baking | at 60 °C (effective metal temperature) for 30-40 min. |
OR | |
Air dry @ 30°C & 60 – 65% RH | dust free : 30 – 35 min |
Handelable : 4-5 hrs | |
into service : Overnight |
Remove dust/orange peel, wherever required | Wet sanding with P1500 followed by P2000 |
Rubbing/ polishing (if required) | Use Farecla G3 Advanced Liquid 1Step rubbing compound with lamb’s wool pad followed by finishing glaze with polishing pad with machine |
To apply Tack-rag between two coats of dry metallic colors and before applying clear coats. |
Nozzle size of Spray Gun for primer application shall be 1.6 mm to 1.8 mm. |
Nozzle size of Spray Gun for topcoat application shall be 1.3 mm to 1.4 mm. |
Etch Primer | Nax Ultima Etch primer |
Mixing | Base : Activator 1 : 1 by volume. |
Maturation Time | 5 -10 minutes @ 25deg Centigrade |
Application( type & no.of coats) | Spray Gun at 40-50 PSI, Apply 1 coat using spray gun with 1.6 – 1.8 mm fluid nozzle |
DFT | 8 – 14 microns |
Air dry (at 30°C; 60 – 65% RH) | 45 – 60 minutes |
Apply Nax Ultima PUPS wet – on-wet without any sanding on Etch Primer cured as above |
Application | |
Recommended Mixing Ratio | 100 : 2 -3 gms of Activator |
Mix thoroughly and carefully | |
For deep filling (upto 3 mm), apply in several layers allowing each to dry between applications. | |
Play Time: | 3-4 Min |
Drying Time @ 30°C & 60 – 65% RH | |
Sandability time | 20-25 Min |
Flatting ( Dry only) | Dry sand with P80 – 120 followed by P150 – P220 |
Overcoatability time | After sandability time, Overcoat with Nax r for smooth and uniform surface for topcoat application |
Mixing | Base : Hardener 4:1: with 35-40% by volume of recommended Thinner |
For temperature < 30°C use PU thinner: For temperature > 30°C & for large area application use PU Slow Thinner | |
Application( type & no.of coats) | Spray Gun at 40-50 PSI, Apply 1 coat using spray gun with 1.6 – 1.8 mm fluid nozzle |
DFT | Whereever putty is applied 25 – 30 microns |
Drying schedule – Air dry (at 30°C; 60 – 65% RH) | Dry sandable in 60-90 Min |
Sanding: Dry Sanding | P320 grade (for Solid Topcats) & P400 for Metallic Colors |
Wet Sanding | P600 grade (for Solid Topcats) & P800 for Metallic Colors |
Cleaning | Nax Silicone Off using two – rag process, 1 for application and 1 for wipe-off |
Dry/ Wet sanding | 10 min |
Drying Time @ 30°C & 60 – 65% RH | |
Sandability time wet | P600 grade (for Solid Topcats) & P800 for Metallic Colors |
Overcoatability time | After sandability time, Overcoat with Nax r for smooth and uniform surface for topcoat application |
DFT | 40-50 microns |
Mixing | Base : Hardener 4 : 1 by volume with 25-30% with Sueprio medium PU thinner for temperature < 30°C & with Nax Slow Thinner for large area application and temperature > 30°C |
Maturation Time | Not required |
Pot life at 30°C & 60 – 65% RH | 4 Hours |
Application | 2 coats, ~ 10 minutes flash off between coats |
Drying schedule: baking | at 60°C (effective metal temperature) for 25-30 minutes |
OR | |
Air dry @ 30°C & 60 – 65% RH | Dust free : 40-45 min. |
Handelable : 4-4.5 hrs | |
Into service : Overnight |
DFT | 20-25 microns |
Mixing | 1 : 1 with Nax Slow Thinner |
Application | By spray at 40-45 PSI with a flash-off time of 5 minutes between coats. Apply two to three coats as required. Use spray gun of fluid nozzle 1.3 – 1.5 mm fluid nozzle |
Maturation time | Not required |
Drying schedule | Allow 15 – 20 minutes Flash-off @ 30°C & 60 – 65% RH before applying Clearcoat |
Apply Tack-rag between two coats of dry metallic colors and before applying clearcoat |
DFT | 40 – 50 microns |
Mixing | 3:1 with 25-30 % Superio Slow Thinner by volume |
Pot life @ 30°C & 60 – 65% RH | 6 hours |
Application | Apply 2 coats with 15 mins flash off between coats. Apply at a pressure of 45-50 PSI. using spray gun of fluid nozzle 1.3 – 1.5 mm fluid nozzle |
Drying schedule: baking | at 60 °C (effective metal temperature) for 30-40 min. |
OR | |
Air dry @ 30°C & 60 – 65% RH | dust free : 30 – 35 min |
Handelable : 4-5 hrs | |
into service : Overnight |
Remove dust/orange peel, wherever required | Wet sanding with P1500 followed by P2000 |
Rubbing/ polishing (if required) | Use Farecla G3 Advanced Liquid 1Step rubbing compound with lamb’s wool pad followed by finishing glaze with polishing pad with machine |
To apply Tack-rag between two coats of dry metallic colors and before applying clear coats. |
Nozzle size of Spray Gun for primer application shall be 1.6 mm to 1.8 mm. |
Nozzle size of Spray Gun for topcoat application shall be 1.3 mm to 1.4 mm. |